Home › Products › Passive-House / Triple › Passive-House Ready uPVC Window — Triple Glazed
Passive-House / Triple · GH-UP300

Passive-House Ready uPVC Window — Triple Glazed

A deep-profile, triple-glazed uPVC platform for projects with a declared Uw and air-tightness target.

ModelGH-UP300
SeriesPassive-House / Triple
Profile system88 / 94 / 112 / 166 mm deep multi-chamber lead-free PVC-U, steel reinforced
GlazingTriple IGU, Low-E coatings, argon or krypton fill, warm-edge spacer; laminated option
Specifications

Technical specifications

The GH-UP300 is the thermal end of the GLOBHAUS uPVC range. It combines a deep multi-chamber profile, triple insulated glazing with warm-edge spacers and a triple compression gasket system, and is intended for projects that state a whole-window U-value, air-tightness class or condensation-risk requirement in the tender documents. Rather than quoting a single catalogue Uw, the build is engineered against the project's design target: profile series, glass build-up, spacer, gas fill and installation detail all change the declared number. GLOBHAUS issues the calculation sheet and the supporting test documentation with the quotation so the value can be checked by the project's energy consultant. Typical applications are Passive House and low-energy housing, heating-dominated climates, and retrofit programmes where the existing façade is being upgraded to a higher thermal standard without switching to a more expensive aluminium system.

Profile system88 / 94 / 112 / 166 mm deep multi-chamber lead-free PVC-U, steel reinforced
GlazingTriple IGU, Low-E coatings, argon or krypton fill, warm-edge spacer; laminated option
Thermal targetWhole-window Uw calculated per build-up and issued as a project calculation sheet, not a fixed catalogue claim
Spacer / edge sealWarm-edge spacer with dual barrier seal to limit linear thermal bridging at the glass edge
SealingThree-level compression gasket system, welded corners, drained and pressure-equalised rebate
Air tightnessClass and test report confirmed against project specification at RFQ stage
HardwareHeavy-duty tilt-turn or fixed-light configuration with multi-point locking
FinishWhite, black, grey, bronze, wood-grain film, custom laminate
CertificationNFRC / PHI / CSA documentation can be prepared for the destination market; confirm the exact standard and test report required at RFQ stage.
Warranty / MOQ / Lead time10 years on profile · 1 × 20 ft container · 35–45 days
In application

Applications

The Passive-House Ready uPVC Window — Triple Glazed in real residential and commercial settings.

Passive-House Ready uPVC Window — Triple Glazed in application

Passive-House Ready uPVC Window — Triple Glazed — residential / project application

Passive-House Ready uPVC Window — Triple Glazed in application

Passive-House Ready uPVC Window — Triple Glazed — residential / project application

Drawings & CAD

Drawings

📋

Technical drawings & CAD files

Section details, elevations and node drawings are provided per project. Download the general profile drawing package, or contact us for the complete CAD / BIM files of this model.

Download CAD Package Request model drawings
Certifications

Certifications

Our quality, environmental and occupational health & safety management systems are certified to ISO 9001, ISO 14001 and ISO 45001.

ISO 9001 · Quality (EN)

ISO 9001 · Quality (EN)

ISO 14001 · Environment (EN)

ISO 14001 · Environment (EN)

ISO 45001 · OH&S (EN)

ISO 45001 · OH&S (EN)

ISO 9001 · Quality (CN)

ISO 9001 · Quality (CN)

ISO 14001 · Environment (CN)

ISO 14001 · Environment (CN)

ISO 45001 · OH&S (CN)

ISO 45001 · OH&S (CN)

FAQ

Frequently asked questions

Is this window certified by the Passive House Institute?

No certification claim is made for a standard product. The GH-UP300 is engineered to a project-declared thermal target; the required test reports and calculation sheets are listed and supplied at RFQ stage for the destination market.

What Uw value can be achieved?

It depends on the profile series, triple glass build-up, coating, gas fill and spacer. We issue a project calculation sheet with the declared value rather than quoting a single fixed number.

Does installation affect the declared performance?

Yes. The frame must sit in the insulation plane with continuous airtight tapes; a frame installed back in the cold zone creates a thermal bridge that a product calculation cannot cover.

Can triple glazing be combined with tilt-turn operation?

Yes, using heavy-duty hardware. Sash weight is checked against the hinge and gearbox rating before the configuration is released.

What are MOQ and lead time?

One 20 ft container with 35–45 days production after drawing and glass build-up approval.

Keep exploring

Related products

Specify Passive-House Ready uPVC Window — Triple Glazed for your project

Send your opening schedule and glass build-up — we return a quote and full export documentation. Custom sizes, OEM/ODM and worldwide shipping available.

Request a Quote
WhatsAppCall usEmail us