Passive-House Ready uPVC Window — Triple Glazed

Passive-House Ready uPVC Window — Triple Glazed. A deep-profile, triple-glazed uPVC platform for projects with a declared Uw and air-tightness target.

Passive-House Ready uPVC Window — Triple Glazed — GLOBHAUS
Triple IGU · Warm-edge spacer · Deep multi-chamber profile

Passive-House Ready uPVC Window — Triple Glazed

A deep-profile, triple-glazed uPVC platform for projects with a declared Uw and air-tightness target.

Overview

The GH-UP300 is the thermal end of the GLOBHAUS uPVC range. It combines a deep multi-chamber profile, triple insulated glazing with warm-edge spacers and a triple compression gasket system, and is intended for projects that state a whole-window U-value, air-tightness class or condensation-risk requirement in the tender documents.

Rather than quoting a single catalogue Uw, the build is engineered against the project’s design target: profile series, glass build-up, spacer, gas fill and installation detail all change the declared number. GLOBHAUS issues the calculation sheet and the supporting test documentation with the quotation so the value can be checked by the project’s energy consultant.

Typical applications are Passive House and low-energy housing, heating-dominated climates, and retrofit programmes where the existing façade is being upgraded to a higher thermal standard without switching to a more expensive aluminium system.

Technical specification

Profile system88 / 94 / 112 / 166 mm deep multi-chamber lead-free PVC-U, steel reinforced
GlazingTriple IGU, Low-E coatings, argon or krypton fill, warm-edge spacer; laminated option
Thermal targetWhole-window Uw calculated per build-up and issued as a project calculation sheet, not a fixed catalogue claim
Spacer / edge sealWarm-edge spacer with dual barrier seal to limit linear thermal bridging at the glass edge
SealingThree-level compression gasket system, welded corners, drained and pressure-equalised rebate
Air tightnessClass and test report confirmed against project specification at RFQ stage
HardwareHeavy-duty tilt-turn or fixed-light configuration with multi-point locking
FinishWhite, black, grey, bronze, wood-grain film, custom laminate
CertificationCE / NFRC / AS2047 documentation can be prepared for the destination market; confirm the exact standard and test report required at RFQ stage.
Warranty / MOQ / Lead time10 years on profile · 1 × 20 ft container · 35–45 days

Why specify this unit

✓
Engineered to a declared Uw: The quotation is built around the project’s thermal target with a calculation sheet, not a marketing number.
✓
Warm-edge spacer: Reduces the glass-edge thermal bridge that dominates frame performance in cold climates.
✓
Triple gasket levels: Separate water, air and drainage planes reduce condensation risk at the rebate.
✓
Deep-profile stiffness: 88–166 mm series handle heavy triple IGUs without additional structural reinforcement of the opening.
✓
uPVC cost base: Delivers high thermal performance at a lower system cost than thermally broken aluminium.
✓
Documentation for consultants: Glass build-up, spacer, gas fill and declared values are supplied for the energy model.

Installation notes

These are the points that decide whether the unit performs as specified after handover. They are issued as a drawing package with the order and should be read alongside the project’s own structural and waterproofing details.

1. Agree the performance target

Fix the required Uw, air-tightness class and installation detail with the energy consultant before drawings are released — the glass build-up depends on it.

2. Specify the installation plane

High-performance windows must be positioned in the insulation layer; a frame set back into the cold zone creates a thermal bridge the calculation will not cover.

3. Use airtight tapes

Apply vapour-open exterior and vapour-tight interior tapes with a continuous, compressed connection to the frame.

4. Support the weight

Triple IGUs are heavy: use load-bearing packers and confirm the fixing schedule with the structural designer.

5. Protect the spacer seal

Never drill or fix through the glazing rebate; keep the edge seal clear of sealants that are not chemically compatible.

6. Verify on site

Blower-door or per-window air-leakage checks after installation, plus a written record of the installed build-up for the energy certificate.

Where it is specified

Passive House / low-energy housing

Where a declared whole-window Uw is a contractual requirement.

Cold and heating-dominated climates

Triple glazing and warm-edge spacers cut heat loss and interior condensation risk.

Deep-energy retrofit

Upgrading an existing façade without moving to a premium aluminium system.

Projects with third-party energy modelling

Calculation sheets and build-up documentation feed directly into the consultant’s model.

Maintenance and service life

Thermal performance depends on the seals remaining compressed and the rebate staying dry. Inspect gaskets annually, clear drainage slots twice a year and re-adjust multi-point cams if the handle becomes easier to turn. Avoid trimming or planing the frame on site, and keep the original glass build-up record: replacing an IGU with a different coating or gas fill changes the declared Uw.

How it compares

CriterionThis configurationAlternative
Thermal targetEngineered to a project-declared Uw with a calculation sheetStandard 60–70 mm uPVC: no declared target
GlazingTriple IGU with warm-edge spacer as baselineDouble Low-E as baseline
Installation sensitivityHigh — insulation-plane positioning and airtight tapes are mandatoryModerate
Best fitPassive House, cold climates, certified retrofitsStandard residential, mild climates

Frequently asked questions

Is this window certified by the Passive House Institute?

No certification claim is made for a standard product. The GH-UP300 is engineered to a project-declared thermal target; the required test reports and calculation sheets are listed and supplied at RFQ stage for the destination market.

What Uw value can be achieved?

It depends on the profile series, triple glass build-up, coating, gas fill and spacer. We issue a project calculation sheet with the declared value rather than quoting a single fixed number.

Does installation affect the declared performance?

Yes. The frame must sit in the insulation plane with continuous airtight tapes; a frame installed back in the cold zone creates a thermal bridge that a product calculation cannot cover.

Can triple glazing be combined with tilt-turn operation?

Yes, using heavy-duty hardware. Sash weight is checked against the hinge and gearbox rating before the configuration is released.

What are MOQ and lead time?

One 20 ft container with 35–45 days production after drawing and glass build-up approval.

Gallery

Passive-House Ready uPVC Window — Triple Glazed — GLOBHAUS Passive-House Ready uPVC Window — Triple Glazed — GLOBHAUS Passive-House Ready uPVC Window — Triple Glazed — GLOBHAUS

Talk to the factory

Send the opening schedule, glazing build-up and target market. Quotations within 24 hours.

Request a Quote