
uPVC Casement Window — Side-Hung
A simple, robust side-hung sash that delivers full opening area at the lowest unit cost in the uPVC range.
Overview
The GH-UP120 is a side-hung casement built for volume programmes where the specification calls for reliable operation, straightforward installation and a predictable landed price. One sash rotates on side-mounted hinges to open the full clear aperture, which makes it the natural choice for cross-ventilation in housing and light-commercial projects.
Compared with a tilt-turn unit, the hardware set is simpler: a handle, a multi-point espagnolette, friction stays and a pair of hinges. Fewer moving parts means fewer adjustment callbacks and a spare-part list a local distributor can carry without specialist stock. Outward and inward opening variants are both available to match local façade rules.
It is the default specification for low- and mid-rise residential developments, schools and renovation programmes in warm and temperate markets, where full-open ventilation matters more than secure night ventilation.
Technical specification
| Profile system | 60 / 65 / 70 / 80 mm multi-chamber lead-free PVC-U, steel reinforced where required |
|---|---|
| Operation | Side-hung casement, inward or outward, single or double sash, optional top vent |
| Hardware | Espagnolette multi-point lock, friction stay, adjustable hinge, optional child limiter |
| Glazing | Double Low-E, triple, laminated acoustic or tempered safety IGU; 24–40 mm build-ups |
| Sealing | Compression gaskets with welded corners and drained glazing rebate |
| Finish | White, black, grey, bronze, wood-grain film, custom laminate |
| Certification | CE / NFRC / AS2047 documentation can be prepared for the destination market; confirm the exact standard and test report required at RFQ stage. |
| Screen options | Fixed, sliding or pleated insect screen supplied to suit inward/outward variant |
| Warranty / MOQ / Lead time | 10 years on profile · 1 × 20 ft container · 30–40 days |
| Service | OEM / ODM, project schedules, mixed-container loading |
Why specify this unit
Installation notes
These are the points that decide whether the unit performs as specified after handover. They are issued as a drawing package with the order and should be read alongside the project’s own structural and waterproofing details.
1. Check the schedule
Match each frame to the opening schedule and confirm the opening direction on the drawing — inward and outward variants are not interchangeable on site.
2. Dry-fit and level
Set packers at hinge and lock points, check diagonals, and keep the frame square before any anchoring.
3. Fix without distorting
Anchor at the specified centres, tightening progressively; over-tightening a single fixing bows the frame and causes sash drop.
4. Seal and drain
Install the exterior weather seal and interior air seal, then verify weep holes are unobstructed and discharge to the outside.
5. Glaze with correct packers
Use glazing bridge packers so the sash weight is carried at the diagonal corners, not at the hinge alone.
6. Commission
Cycle every sash, adjust the stay friction and striker, and record any handle stiffening before handover.
Where it is specified
Volume housing
Repeated opening sizes, low unit cost and simple hardware make it the standard choice for phased residential builds.
Warm-climate projects
Full-open ventilation is more valuable than secure night ventilation in markets where windows stay open for long periods.
Schools and low-rise commercial
Robust operation, easy replacement parts and optional limiters for child safety.
Renovation programmes
Made-to-measure frames absorb out-of-square existing openings without rebuilding the reveal.
Maintenance and service life
Clean the frame with mild soapy water, clear the drainage slots seasonally and check stay friction once a year. Because the sash is side-hung, hinge adjustment is the main service task: a small drop over time is corrected at the hinge adjuster rather than by planing the sash. Gaskets and stays are replaceable as standard parts.
How it compares
| Criterion | This configuration | Alternative |
|---|---|---|
| Ventilation control | Two states — closed or fully open | Tilt-turn: adds a secure restricted-ventilation position |
| Unit cost | Lowest in the uPVC range | Higher due to the tilt-turn gearbox |
| Cleaning above ground | Depends on opening direction | Inward tilt-turn: always from inside |
| Best fit | Volume housing, warm climates, budget-led tenders | High-rise, hotels, cold climates |
Frequently asked questions
Are uPVC casement windows available opening outwards?
Yes. Both inward and outward side-hung variants are produced; the direction must be fixed on the approved drawing because the hinge, stay and screen details differ.
Can a child-safety limiter be fitted?
Yes. Restricted-opening stays and handle-operated limiters are available, and are commonly specified for schools and family housing.
What glazing and U-values can be achieved?
24–40 mm double Low-E, triple, laminated and tempered build-ups are supported. The declared Uw is calculated from the selected profile series and glass rather than quoted as a fixed catalogue number.
What is the minimum order and lead time?
One 20 ft container, with 30–40 days production after drawing approval. Mixed sizes and other uPVC configurations can share the container.
Do you supply insect screens?
Fixed, sliding and pleated screens can be included and are specified against the opening direction so they do not clash with the stay.
Gallery

Talk to the factory
Send the opening schedule, glazing build-up and target market. Quotations within 24 hours.
Request a Quote